Proliner UV curing repair supports the Yibin project in Sichuan, breaking through the "three major mountains" of curing repair

Overview of the Second Phase of the Underground Comprehensive Pipe Gallery Construction Project in Sanjiang New Area, Yibin: UV-CPIPP, CIPP, spraying, grouting and other methods were used to repair and rectify the approximately 165 kilometer municipal rainwater and sewage pipe network within the scope of Sanjiang New Area, and to remove sediments, obstacles, etc.
The main roads involved include 53 municipal roads such as Changjiang North Road, Changcui Road, Daxue Road, Gangyuan Road West Section, and Jinghua Road.

微信图片_20241030162637.jpg

Repair Overview

Application project: Phase II of the Comprehensive Pipe Gallery Construction Project in Sanjiang New Area, Yibin, Sichuan

Application time: July 2024

Application address: Yibin City, Sichuan Province

Application product: DN1000-1593 large pipe diameter, waterproof outer membrane inner lining repair material

The UV-CIPP hoses and equipment provided by Proliner have been successfully applied in the repair work of some pipelines and have achieved significant results. These successful cases not only prove the progressiveness and reliability of the Prahlan technology, but also provide a strong guarantee for the smooth progress of the project.

In summary,Proliner has provided strong technical and material support for the second phase of the underground comprehensive pipe gallery construction project in Sanjiang New Area, Yibin by offering advanced UV-CIPP hoses and equipment. This not only helps to improve the construction efficiency and quality of the project, but also promotes the sustainable development of urban infrastructure construction, bringing a better future for the urban construction and residents' lives in Yibin City.

Fix difficulties

1. Long term high-temperature operation during solidification: In high-temperature environments, equipment may be at risk of overheating, damage, etc. Effective heat dissipation and protective measures need to be taken; Long term high-temperature operations may lead to increased equipment wear and tear, which increases the difficulty of curing.
2. Working in water related environments: Repair pipes with obvious flowing water. The Proliner UV cured repair lining hose enters the original pipe and floats on the surface of the accumulated water, making it unable to adhere to the original pipe. During the conventional UV in-situ curing lining hose cutting process, it is easy to detach from the bottom film and cause scratches with the original pipe, resulting in material damage and water ingress.
3. Large diameter repair: The construction section for pipeline repair is relatively complex, with some sections having large diameters of DN1000-1590.

Application site

微信图片_20241030162623.jpg
微信图片_20241030162616.jpg
微信图片_20241030162637.jpg